Please click one of the links below to read the specific parts of the project

Background
Vision Objective
Proposals
Rationale

Background:

Salt Lane is a short stay (0-5 hours) surface car park containing 157 spaces, located within the ring road to the east of the city centre. It is surrounded predominantly by a residential area but with some commercial premises nearby. It is very close to the existing bus station, the Arts Centre and Bourne Hill. It is a four minute walk from the Culver Street car park and three minutes from the Market Place.

Vision Objective:

Develop primarily for housing with possible live/work or small retail units and include a small public space

Back to top

Proposals:

  • Provide a small public space or square that can utilise the existing active uses around it such as places of work and public houses. This should include appropriate lighting and street furniture
  • Ensure that active frontages at ground floor in particular will contribute to natural surveillance and activity of the public space or square

Rationale:

  • To re-use this site for the benefit of the city if the Parking Strategy and Transport and Movement Strategy show that it is not needed for parking
  • To contribute to a more pedestrian orientated city centre
  • To increase the amount of city centre living in order to provide more vibrancy at different times of the day
  • To release capital receipt to deliver other projects within the Vision

Back to top